Quality intelligence

Code is no longer the bottleneck. Judgement is.

When anyone can generate a product in an afternoon, the hard part is knowing you built the right thing — and built it right. Soma QI scores any product link against stage gates, backs every verdict with evidence, and tells you exactly what stands between you and the next stage.

Visitors get 2 free assessments every 24 hours · sign in for full findings and more runs.

Sample · Services · Prototype◑ Needs improvement

78

/100 · gate to MVP is 80

  • Product Fit88
  • Experience81
  • Functional64
  • Business79
  • Technical90
  • Trust & Readiness72

NOW Booking form has no confirmation state — fix before MVP.

Illustrative example, not a real assessment.

You built it right. But is it the right thing?

The Truth TestSoma QI · Film

01

Build the right thing

Is the problem real, the offer clear, and the path to value obvious to the people it's for? Generated code can't answer this.

Product fit · Business · Trust & readiness

02

Build the thing right

Do journeys complete, links resolve, pages load, and the experience hold up on mobile and for everyone?

Experience · Functional · Technical

How it works

See your product through your customer’s eyes. Spot what’s broken, what’s confusing, and what to fix before you launch.

  1. 01Paste your website link

    No setup, no passwords, and no tech skills required. Just paste your link and let it run.

  2. 02We verify the full experience

    Testing as a real customer from first impression to main action, ensuring nothing blocks conversion.

  3. 03Get your launch checklist

    A clear, step-by-step list of what to fix first, so you can share your product with confidence.

Every stage is a level. Earn the next one.

Quality is stage-appropriate — a prototype isn't held to launch standards. To pass a gate, a product must hit the threshold, clear every critical rule, carry no unresolved blocker, and have enough evidence to be confident.

Stage gates & progression

Founder Value Milestones

  1. Tier 1 · L1–L3 · Idea → Prototype

    Validation

    Zero architectural waste: prove thesis before generating bloat.

  2. Tier 2 · L4–L5 · MVP → Beta

    Build & Prove

    Investor conviction: clear fatal blockers, prove user traction.

  3. Tier 3 · L6–L7 · Launch → Growth

    Product Market Fit

    True retention loops, repeatable unit economics, and organic pull that proves you built the right thing.

The Peak

Stage L8 · Scale

Category authority, enterprise pricing power, institutional defensibility, and unassailable network effects.

Market & Industry Dominance

Where does your product stand right now?

Benchmark your build in 60s against standard gate criteria

Run Assessment →

Product Fit 20 · Experience 20 · Functional 20 · Business 15 · Technical 15 · Trust & Readiness 10 — a critical blocker overrides any score.

What builders are saying

Feedbacks from real founders and builders

“I found the feedback report incredibly valuable! It provided a very structured, prioritized action plan ('Getting to Growth') that tackled everything from user trust and privacy compliance to technical fixes like the Instagram 429 error and link monitoring. Having clear priority tags like (Now) and (Next) made it seamless to act on right away.”

Marcus T.

Founder · Stage: Getting to Growth

Fixed 429 Blocker & Privacy Baseline
“When you pour months into handcrafting a product, you become blind to your own flaws. Soma QI gave me an objective, outside-in evaluation that caught confusing copy and missing user trust cues before our community launch.”

Wellington E.

Artisan Founder

Solved Value Clarity & Trust Cues
“Building with no-code means we move fast, but we don't always catch broken edge cases. Soma QI ran through our full visitor journey and flagged an unlinked CTA and mobile flow stall that would have cost us signups.”

David O.

Founder, No-Code

Cleared Mobile Journey Blocker
“Soma QI caught a broken auth redirect and an unlinked pricing button two hours before our launch tweet. Saved us from a completely wasted first impression and lost early adopters.”

Alex M.

Solo Builder · Stage: Prototype → MVP

Caught 1 Essential Blocker
“We generated our entire SaaS MVP in a weekend, but visitors weren't signing up. The audit pinpointed that our mobile onboarding stalled and our headline was too vague. Fixed both in an afternoon and signups started flowing.”

Sarah K.

Vibe Developer · Stage: MVP → Beta

Cleared Mobile Flow Bottleneck

FAQ

Questions builders actually ask.

Chat on WhatsApp